Dimorphos orbital period shortened by 33 minutes after DART impact

What was demonstrated
Earth-based lightcurve and radar observations measured the orbital period of Dimorphos around Didymos changing by -33.0 ± 1.0 minutes (3σ) after NASA's DART spacecraft struck it. Two independent methods gave identical values. A simple momentum-transfer estimate from the spacecraft alone predicted a change of about 7 minutes, so the authors infer that ejecta carried substantial additional momentum.
Why it matters
The measured change is about four to five times the momentum-transfer prediction, which suggests that ejected material can greatly increase the effect of a kinetic impactor. This is relevant to kinetic impact as one planetary defence option, though the result comes from a single small asteroid pair.
Caveats
- The ejecta contribution is inferred from the measured period change. The authors state that estimating the change in Dimorphos's orbital velocity needs modelling beyond the paper's scope.
- Ejecta contaminated the photometry, and some radar and astrometry measurements relied on stated assumptions and de-weighted or inflated uncertainties.
- Post-impact lightcurve observations ended on 10 October 2022 because bright moonlight reduced precision.
- The result applies to Didymos and Dimorphos only and does not show how a kinetic impact would work on other asteroids.
Technology profiles
Sources
- peer reviewed paper
Orbital period change of Dimorphos due to the DART kinetic impact
Cristina A. Thomas, Shantanu P. Naidu, Peter Scheirich et al.. Nature, 1 Mar 2023. DOI: 10.1038/s41586-023-05805-2.
Last reviewed 22 Oct 2026.